Home / Articles / What a title block needs, and how to control revisions so nobody builds the old version
Guide · Production and documentation

What a title block needs, and how to control revisions so nobody builds the old version

7 min read · updated 3 Nov 2026

The title block is a drawing's identity card: what the part is, its number, its revision, who drew and approved it, and which standards apply. Many of the most expensive mistakes in a factory come not from a wrong drawing but from making parts from an old revision. A good title block and disciplined revision control prevent that.

Fields a title block should have

ISO 7200 recommends identifying and descriptive fields such as these:

FieldExampleNotes
Owner (company / department)ABC Co., Ltd.Who is responsible for the drawing
TitleBRACKET, MOTOR MOUNTMain noun first, then qualifiers — easier to search
Drawing numberDWG-1024-031Unique in the company; never reuse a cancelled number
RevisionA, B, C… or 00, 01, 02…The current revision of the drawing
MaterialS275 t3.0, 304 stainless, 6061-T6Include thickness for sheet parts
Finish / colourZinc plated, powder coat RAL 7035Write "–" rather than leaving it blank
General toleranceISO 2768-mSee general tolerances ISO 2768
Scale and units1:2, mmWith several scales, state the main one
Projection symbolFirst or third angleSee first- vs third-angle projection
Drawn / checked / approved, with datesInitials and dateA drawing without approval should not go to production
Paper size and sheetA3, 1/2Helps confirm every sheet was printed

The revision table

Besides the revision field in the title block, a drawing should carry a separate revision history, usually above the title block or at the top right. Each line is one change.

Rev.DescriptionECN no.DateApproved
AFirst issue–2026-09-01SP
BØ6 holes changed to Ø6.6 (4 places) · length 120 changed to 125ECN-2610-072026-10-15SP

Describe changes so a machinist knows at once what moved — give both the old and the new value. Many companies also put a triangle with the revision letter next to each changed feature on the drawing.

Raising the revision after an ECN

  1. Open an ECN (Engineering Change Notice) with the reason, the parts affected and what happens to existing stock (use as is, rework or scrap).
  2. Change the drawing, raise the revision in the title block, add a line to the revision table and mark the changed features.
  3. Check and approve again — every time, even for a single number.
  4. Release the new revision to everyone who holds the old one: production, QC, purchasing and suppliers.
  5. Remove old copies from the shop floor: stamp them "OBSOLETE" or recall them, and keep an archive copy in the document system.
  6. Put the revision in the file name, e.g. DWG-1024-031_RevB.pdf, so anyone receiving the file knows which one it is.
The one golden rule: once a drawing has left the design office, never change it without raising the revision — not even a spelling fix. Otherwise two different drawings exist with the same revision.

Frames and title blocks in DXCAD2D Online

  1. Finish the drawing at 1:1 in mm; there is no need to draw a frame yourself.
  2. Choose Export → PDF… (or DXF) and tick Add drawing frame + title block (template).
  3. Fill in company / department, part name, drawing no., Rev., material, finish / colour, general tolerance, drawn by, checked by, approved by and date. Choose the paper size, orientation, scale (automatic works) and projection symbol.
  4. The program remembers what you entered, so next time you only change what moved — such as Rev. and date.
  5. Draw the revision table yourself with rectangles (REC) and text (T) above where the title block goes. Make one row, add rows with Array (AR) or Copy (CO), then group it (G) so it moves as one.

Try it right now — a free 2D CAD in your browser. Nothing to install, no sign-up.

Open DXCAD2D Online

Checklist before release

  • Drawing number and revision match in the title block, the revision table and the file name.
  • Material, thickness, finish and general tolerance are filled in — no blanks.
  • The projection symbol matches how the views are actually arranged.
  • The scale in the title block matches the printed scale (measure a known line on paper).
  • Checked and approved, with dates.

More on paper and frames in drawing paper sizes, and on inspection drawings in named dimensions and a dimension table.